首页|期刊导航|中国电力|印尼Indramayu电站330MW机组FCB试验

印尼Indramayu电站330MW机组FCB试验

安欣 刘国弼 张亚夫 王海涛 李广春

中国电力2011,Vol.44Issue(9):40-44,5.
中国电力2011,Vol.44Issue(9):40-44,5.

印尼Indramayu电站330MW机组FCB试验

Fast cut back test on 330 MW unit in Indonesia Indramayu Power Plant

安欣 1刘国弼 1张亚夫 1王海涛 1李广春2

作者信息

  • 1. 西安热工研究院有限公司,陕西西安710032
  • 2. 中国电力工程有限公司,北京100048
  • 折叠

摘要

Abstract

Fast Cut Back ( FCB) test is a special operation mode on the unstable grid conditions, which was involved not only high risk but also high difficulties. With the increasing of the export units which has the ability to do FCB test, summarizing analysis on the test and improving its function become the direction deserved to be researched. The preparation of the FCB test of the 330 MW unit in Indramayu Power Plant was introduced. The lest process under 50% load and 100% load were described. The results showed that the unit could cut the load down to house supply without any intervention before the operation start. The problems in the duration of the test were analyzed and the solution was proposed, which can provide a reference for the FCB test of the same type units.

关键词

330MW机组/FCB试验/负荷/厂用电

Key words

330 MW unit/ FCB test/ load/ house supply

分类

能源科技

引用本文复制引用

安欣,刘国弼,张亚夫,王海涛,李广春..印尼Indramayu电站330MW机组FCB试验[J].中国电力,2011,44(9):40-44,5.