摘要

Abstract

Well 001-3 in Longgang field is completed with the total depth of 6643.89 m. During the liner cementing process, bit sticking is caused by the cement setting, and the length of the fish is 1847.6m. After analyzing the case, it was believed that only long section milling treatment could trip the fish. To ensure the safety of the mill pipe and 0177.8 mm casing, the difficulties of the treatment were analyzed and the solving plan was optimized, which was to modify the mill ring to satisfy with the ability of milling iron and cement but not damaging the casing. Through managing the rotating torque, the damage of milling the curved fish to the mill ring was decreased. The tripping method for the irregularly shaped fish after milling treatment was found. The treatment ensured the conduction of milling and tripping for the cementing section with the depth of 3896.79~4733.40 m, and it made no damage to the mill pipe or casing. The treatment supplies a valuable case to the same type wells.

关键词

龙岗001-3井/套铣/水泥环/金刚石铣圈/卡钻事故/打捞/倒扣

Key words

Well 001-3 Longgang/ milling/ mud ring/ diamond milling ring/ bit sticking

分类

能源科技

引用本文复制引用

冯志军,古广平,杨宝春,刘德平,何文平..龙岗001-3深井长井段水泥卡钻事故处理[J].石油钻采工艺,2011,33(4):113-115,3.

基金项目

川庆钻探工程公司科研项目“注水泥作业卡钻事故处理技术研究”(编号:2010-86)的部分内容. (编号:2010-86)

石油钻采工艺

OA北大核心CSCDCSTPCD

1000-7393

访问量4
|
下载量0
段落导航相关论文