| 注册
首页|期刊导航|西北地震学报|西板岔沟尾矿坝静力和动力稳定性分析

西板岔沟尾矿坝静力和动力稳定性分析

胡再强 赵宏斌 王晓东 张千一

西北地震学报2011,Vol.33Issue(z1):290-294,5.
西北地震学报2011,Vol.33Issue(z1):290-294,5.

西板岔沟尾矿坝静力和动力稳定性分析

Static and Dynamic Stability Analysis of the Xibanchagou Tailing Dam

胡再强 1赵宏斌 1王晓东 2张千一1

作者信息

  • 1. 西安理工大学岩土工程研究所,陕西西安710048
  • 2. 东方电气集团国际合作有限公司,四川成都610036
  • 折叠

摘要

Abstract

Using the EFES3D program that developed by Xi'an University of Technology, base on the equivalent viscoelastic constitutive model used in the 3D effective stress FEM analysis, the analysis for the permanent residual deformation, liquefaction and slope stability from earthquake response at Xibanchagou tailings dam in Lunan county Hehan province. By finite element calculation, for the static dam slope stability, the minimum safety factor is 1.9, for the dynamic slope stability, at the end of seismic response safety factor is 1.19. The results show that the Xibanchagou tailings dam is stable in the static calculation and the seismic response.

关键词

尾矿坝/静力分析/动力分析/稳定性/边坡安全系数

Key words

Tailing damt Static analysis/Dynamic analysis/Stability/Slope safety factor

分类

建筑与水利

引用本文复制引用

胡再强,赵宏斌,王晓东,张千一..西板岔沟尾矿坝静力和动力稳定性分析[J].西北地震学报,2011,33(z1):290-294,5.

基金项目

国家自然科学基金(50778152)-陕西省重点实验室项目(09JS104) (50778152)

西北地震学报

OA北大核心CSCDCSTPCD

1000-0844

访问量0
|
下载量0
段落导航相关论文