西北地震学报2011,Vol.33Issue(z1):299-302,315,5.
粉喷桩施工引起的超孔隙水压力分析
Excess Pore Water Pressure Due to Dry Jet Mixing Column Construction
黄铭 1杨磊 2夏国星 3王驰2
作者信息
- 1. 泰州长江公路大桥建设服务指挥部,讧苏泰州225300
- 2. 上海交通大学土木工程系,上海200240
- 3. 江苏省长江公路大桥建设指挥部,江苏泰州225300
- 折叠
摘要
Abstract
Relying on the project of dry jet mixing column for strengthening soft soil at a road site in Jiangsu province, the soils' excess pore water pressure and earth pressure during the process of construction were monitored when the speed of construction is fast, the pressure is larger. The test results show: the soils excess pore pressure decreases with distance from the column and dissipates in 1 hour after construction. When the construction sequence is faced the pile, the pressure is accumulated while is shielded when in the opposite direction. Compared with construction in sequence, the pressure is lower if doing skip construction. So selecting appropriate construction speed, sequence, direction and pile spacing for the dry jet mixing pile in soft soil site can decrease the excess pore water pressure effectively during the construction.关键词
软土/粉喷桩/超孔隙水压力/土压力Key words
Soft soil/Dry jet mixing column/Excess pore water pressure/Earth pressure分类
建筑与水利引用本文复制引用
黄铭,杨磊,夏国星,王驰..粉喷桩施工引起的超孔隙水压力分析[J].西北地震学报,2011,33(z1):299-302,315,5.