| 注册
首页|期刊导航|水利水电技术|水电站尾水管隔墩结构与水力联合优化研究

水电站尾水管隔墩结构与水力联合优化研究

王海军 张修磊

水利水电技术2011,Vol.42Issue(10):97-100,4.
水利水电技术2011,Vol.42Issue(10):97-100,4.

水电站尾水管隔墩结构与水力联合优化研究

Study on combined structural and hydraulic optimization for dividing pier of elbow draft tube of hydropower station

王海军 1张修磊1

作者信息

  • 1. 天津大学水利工程仿真与安全国家重点实验室,天津300072
  • 折叠

摘要

Abstract

Based on Cirimaji non-linear turbulence model and William-Wamke 5-parameter failure model, both the flow regime and concrete material of the elbow draft tube are simulated, and then a combined structural and hydraulic optimization program for the dividing pier of elbow draft tube is compiled with ANSYS Parametric Design Language ( APDL). When the program is applied to the calculation for the technical improvement on the draft tube of a hydropower station in river channel, not only a better value for the move-down of the pier is obtained, but also a reliable data basis is made for the engineering design of the project

关键词

水电站/尾水管/隔墩/联合优化/紊流模型

Key words

hydropower station/draft tube/dividing pier/combined optimization/turbulence model

分类

建筑与水利

引用本文复制引用

王海军,张修磊..水电站尾水管隔墩结构与水力联合优化研究[J].水利水电技术,2011,42(10):97-100,4.

基金项目

国家自然科学基金青年科学基金(50909072) (50909072)

教育部博士点新教师基金(20090032120082) (20090032120082)

教育部"长江学者和创新团队发展计划"创新团队(IRT0851). (IRT0851)

水利水电技术

OA北大核心CSCDCSTPCD

1000-0860

访问量0
|
下载量0
段落导航相关论文