长江科学院院报2011,Vol.28Issue(10):79-85,7.
水电站蜗壳结构模型试验和原型观测的发展现状
Advances in Model Test and Prototype Observation of Spiral Case Structure in Hydroelectric Power Plant
摘要
Abstract
The research advances of model test and prototype observation applied in the research of Spiral Case Structure in hydroelectric power plant are reviewed. It is indicated that the model test research of the structure with a pad membrane should be promoted, and it' s promising to employ the dynamic structural test technology in studying the dynamic characteristics of the structure ; whereas the monitoring data fails to play its due role owning to the privacy protection for most of the existing monitoring data of the structure, which are rarely seen to be compared with the calculation results. It' s of great importance to monitor the deformation and dynamic response of the structure during its operation. It is anticipated that the model test and prototype observation will both remain throughout the development of researches on the structure.关键词
水电站蜗壳/模型试验/原型观测/发展现状Key words
spiral case/ model test/ prototype observation/ research advance分类
社会科学引用本文复制引用
张启灵,伍鹤皋,李端有..水电站蜗壳结构模型试验和原型观测的发展现状[J].长江科学院院报,2011,28(10):79-85,7.基金项目
国家自然科学基金项目(51179141) (51179141)