| 注册
首页|期刊导航|长江科学院院报|水电站蜗壳结构模型试验和原型观测的发展现状

水电站蜗壳结构模型试验和原型观测的发展现状

张启灵 伍鹤皋 李端有

长江科学院院报2011,Vol.28Issue(10):79-85,7.
长江科学院院报2011,Vol.28Issue(10):79-85,7.

水电站蜗壳结构模型试验和原型观测的发展现状

Advances in Model Test and Prototype Observation of Spiral Case Structure in Hydroelectric Power Plant

张启灵 1伍鹤皋 2李端有3

作者信息

  • 1. 长江科学院工程安全与灾害防治研究所,武汉430010
  • 2. 长江科学院水利部水工程安全与病害防治工程技术研究中心,武汉430010
  • 3. 武汉大学水资源与水电工程科学国家重点实验室,武汉430072
  • 折叠

摘要

Abstract

The research advances of model test and prototype observation applied in the research of Spiral Case Structure in hydroelectric power plant are reviewed. It is indicated that the model test research of the structure with a pad membrane should be promoted, and it' s promising to employ the dynamic structural test technology in studying the dynamic characteristics of the structure ; whereas the monitoring data fails to play its due role owning to the privacy protection for most of the existing monitoring data of the structure, which are rarely seen to be compared with the calculation results. It' s of great importance to monitor the deformation and dynamic response of the structure during its operation. It is anticipated that the model test and prototype observation will both remain throughout the development of researches on the structure.

关键词

水电站蜗壳/模型试验/原型观测/发展现状

Key words

spiral case/ model test/ prototype observation/ research advance

分类

社会科学

引用本文复制引用

张启灵,伍鹤皋,李端有..水电站蜗壳结构模型试验和原型观测的发展现状[J].长江科学院院报,2011,28(10):79-85,7.

基金项目

国家自然科学基金项目(51179141) (51179141)

长江科学院院报

OA北大核心CSCDCSTPCD

1001-5485

访问量0
|
下载量0
段落导航相关论文