深埋隧洞极强岩爆段隧道掘进机半导洞掘进岩爆风险研究

Rockburst risk of tunnel boring machine part-pilot excavation in very strong rockburst section of deep hard tunnel

肖亚勋 1冯夏庭 1陈炳瑞 1丰光亮 1张照太 2明华军1

作者信息

  • 1. 中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,武汉430071
  • 2. 北京振冲工程股份有限公司,北京100024
  • 折叠

摘要

Abstract

Tunnel boring machine(TBM) should face the risk of very strong rockburst directly in intact and brittle rock mass section with ultrahigh stress concentration for full-face excavation in deep tunnel; then safety of equipment and personnel will be under great threat. The excavation test through "part-pilot heading + TBM" is carried out in the diversion tunnel #3 of the Jinping II hydropower station and the rockburst risk of TBM part-pilot excavation is researched via real-time microsesimic monitoring. The results show that: (1) The daily number of microseismic events, the daily accumulative radiated seismic energy, number of big events and frequency and strength of rockburst in the field during part-pilot excavation are far lower than in the period of full-face advance. (2) The time domain evolution of logarithm of energy index and accumulative apparent volume indicates that the risk of strong rockburst in part-pilot section is smaller; and the excavation in field also proved this. (3) In comparison to full-face advance, the degree of concentration, number, magnitude and radiated energy of microseismic events in space in section of part-pilot are far lower. Therefore, the rockburst risk of TBM for part-pilot driving is more less than for full-face advance. In very strong rockburst section, when construction condition is indispensable, the part-pilot can be excavated in advance and then TBM pass, the risk of rockburst can be controlled availably.

关键词

深埋隧洞/隧道掘进机(TBM)/半导洞/极强岩爆/微震监测/锦屏Ⅱ水电站

Key words

deep tunnel/ tunnel boring machine/ part-pilot/ very strong rockburst/ microseismic monitoring/ Jinping II hydropower station

分类

数理科学

引用本文复制引用

肖亚勋,冯夏庭,陈炳瑞,丰光亮,张照太,明华军..深埋隧洞极强岩爆段隧道掘进机半导洞掘进岩爆风险研究[J].岩土力学,2011,32(10):3111-3118,8.

基金项目

国家973项目资助(No.2010CB732006) (No.2010CB732006)

国家自然科学基金项目资助(No.50909092) (No.50909092)

湖北省自然科学基金项目资助(No.2009CDB120). (No.2009CDB120)