Rockburst risk of tunnel boring machine part-pilot excavation in very strong rockburst section of deep hard tunnel

中文摘要英文摘要

深埋隧洞TBM(隧道掘进机)全断面掘进时,在局部超高应力集中的完整硬脆性岩体洞段将直面极强岩爆的风险,设备和人员的安全将遭受极大的威胁.在锦屏Ⅱ水电站3#引水隧洞极强岩爆段实施了“先半导洞+TBM联合掘进”实验,结合微震实时监测信息对TBM半导洞掘进的岩爆风险开展了研究.监测结果表明,(1) TBM半导洞掘进期间,日平均微震事件数、日平均辐射微震能、微震大事件数及实际岩爆发生次数和强度均远远低于TBM全断面掘进;(2)能量指数对数值和累积视体积的…查看全部>>

Tunnel boring machine(TBM) should face the risk of very strong rockburst directly in intact and brittle rock mass section with ultrahigh stress concentration for full-face excavation in deep tunnel; then safety of equipment and personnel will be under great threat. The excavation test through "part-pilot heading + TBM" is carried out in the diversion tunnel #3 of the Jinping II hydropower station and the rockburst risk of TBM part-pilot excavation is researc…查看全部>>

肖亚勋;冯夏庭;陈炳瑞;丰光亮;张照太;明华军

中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,武汉430071中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,武汉430071中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,武汉430071中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,武汉430071北京振冲工程股份有限公司,北京100024中国科学院武汉岩土力学研究所岩土力学与工程国家重点实验室,武汉430071

数理科学

深埋隧洞隧道掘进机(TBM)半导洞极强岩爆微震监测锦屏Ⅱ水电站

deep tunnel tunnel boring machine part-pilot very strong rockburst microseismic monitoring Jinping II hydropower station

《岩土力学》 2011 (10)

深埋硬岩非线性卸荷诱发失稳的时效性机理研究

3111-3118,8

国家973项目资助(No.2010CB732006)国家自然科学基金项目资助(No.50909092)湖北省自然科学基金项目资助(No.2009CDB120).

评论

您当前未登录!去登录点击加载更多...