水利水电技术2011,Vol.42Issue(10):22-24,3.
典型年法的修正及其在城镇给水规划中的应用
Revision of typical hydrological year method and its application to urban water supply planning
摘要
Abstract
In accordance with the problem from the failure of the typical hydrological year method during the planning and design of canyover storage reservoir, the adaptability of this kind of reservoir in the planning of the urban water supply is emphatically discussed herein. Based on the concept of carryover storage of reservoir, the carryover storage of reservoir under the design probability is calculated with the trial method. On the basis of this, the annual water regulating amount of reservoir under the design probability is calculated in combination with the inflow of the design frequency. In light of the principle of multi-purpose water supply of reservoir, the water supply to the water user with a lower probability (such as agricultural water supply) during the year of water supply failure is calculated with the reduction method; relied on this, the design water supply capacity of reservoir for the user with a higher probability (such as urban water supply) is calculated as well.关键词
典型年法/多年调节水库/试算法/城镇供水规划/水库供水能力Key words
typical hydrological year method/carvyover storage reservoir/trial method/urban water supply planning/reservoir water supply capacity分类
水利科学引用本文复制引用
陈利群,蒋咏..典型年法的修正及其在城镇给水规划中的应用[J].水利水电技术,2011,42(10):22-24,3.基金项目
水体污染控制与治理重大专项课题"城市水环境系统的规划研究与示范"(2009ZX07318-001)的资助. (2009ZX07318-001)