In order to improve the transport capacity, technical reformation for the existing stations is usually adopted in the signal design process for adjusting to running ten thousand ton trains, and for which new technical problems emerge. The article introduces the problems encountered in the signal design of ten thousand ton train transport capacity of the reformation projects of Cujiabao station and Hohhot station on Datong-Baotou railway including track segmentation, treatment of insufficient distance between stations and signal setting around the middle switch, with the solutions to the problems put forward. Results indicated that the treatment methods and designed circuits are reasonable and feasible which have been fully verified.

关键词

股道分割/2000A电码化/腰岔/站间联系电路

Key words

Track segmentation/ 2000A coding/ Middle switch/ Liaison circuit between stations