铁道标准设计Issue(11):115-117,3.
大包铁路万吨列车开行站信号特殊问题的解决方案
Solutions to the Special Signal Problems of Ten Thousand Ton Trains for the Starting Stations on Datong-Baotou Railway
赵健1
作者信息
- 1. 中铁第一勘察设计院集团有限公司,西安710043
- 折叠
摘要
Abstract
In order to improve the transport capacity, technical reformation for the existing stations is usually adopted in the signal design process for adjusting to running ten thousand ton trains, and for which new technical problems emerge. The article introduces the problems encountered in the signal design of ten thousand ton train transport capacity of the reformation projects of Cujiabao station and Hohhot station on Datong-Baotou railway including track segmentation, treatment of insufficient distance between stations and signal setting around the middle switch, with the solutions to the problems put forward. Results indicated that the treatment methods and designed circuits are reasonable and feasible which have been fully verified.关键词
股道分割/2000A电码化/腰岔/站间联系电路Key words
Track segmentation/ 2000A coding/ Middle switch/ Liaison circuit between stations分类
交通工程引用本文复制引用
赵健..大包铁路万吨列车开行站信号特殊问题的解决方案[J].铁道标准设计,2011,(11):115-117,3.