输水管线大口径钢顶管施工技术措施

蔡燕飞

净水技术2011,Vol.30Issue(5):147-150,4.
净水技术2011,Vol.30Issue(5):147-150,4.

输水管线大口径钢顶管施工技术措施

Jacking Construction of Large-Diameter Steel Pipe for Water Supply Distribution Pipelines

蔡燕飞1

作者信息

  • 1. 上海水务建设工程有限公司,上海200072
  • 折叠

摘要

Abstract

During the construction of water transportation pipeline of long-distance large-diameter steel pipe with jacking technic, the correct use of technical measure had a large significance on keeping both safe and quality of project and reducing the risk of construction. Based on the construction practice of DN3600 double -line steel pipe jacking in Yanqiao branch of the project of Qingchasha, several problems and corresponding measures existing in the construction technology of large-diameter steel pipe jacking were introduced in the paper.

关键词

钢顶管/大口径/纠偏/双线顶进/机头下钻/上浮力

Key words

steel pipe jacking/large-diameter/correction/double-line jacking/downward drilling of pipe-jacking upward buoyancy force

分类

建筑与水利

引用本文复制引用

蔡燕飞..输水管线大口径钢顶管施工技术措施[J].净水技术,2011,30(5):147-150,4.

净水技术

OACSTPCD

1009-0177

访问量0
|
下载量0
段落导航相关论文