混凝土面板坝渗漏值的工程类比与评价方法

贾金生 郝巨涛 徐耀

水力发电2011,Vol.37Issue(10):28-30,47,4.
水力发电2011,Vol.37Issue(10):28-30,47,4.

混凝土面板坝渗漏值的工程类比与评价方法

Method of Engineering Analogy and Evaluation on CFRDs' Leakages

贾金生 1郝巨涛 2徐耀1

作者信息

  • 1. 中国水利水电科学研究院流域水循环模拟与调控国家重点实验室,北京100038
  • 2. 中国大坝协会,北京100038
  • 折叠

摘要

Abstract

Leakage evaluation of concrete face rockfill dam (CFRD) is an important issue in dam design, and has great influence on dam design, operation and management and decision-making. Based on the monitoring data of 67 constructed CFRDs in domestic and abroad, the engineering analogy and evaluation method on leakages of CFRD is proposed after adopting the comprehensive permeability coefficient of concrete face, and a quantitative formula and its application in a case study are also given herein. The new method can be as reference to engineering analogy and evaluation of CFRD project.

关键词

面板坝/综合渗透系数/渗漏/评价方法

Key words

CFRD/comprehensive permeability coefficient/leakage/evaluation method