水力发电2011,Vol.37Issue(10):44-47,4.
吉音水利枢纽工程混凝土面板坝高趾墙设计
High Toe Wall Design of Jiyin CFRD
李振纲1
作者信息
- 1. 新疆水利水电勘测设计研究院,乌鲁木齐新疆830000
- 折叠
摘要
Abstract
The design of upstream impervious system for Jiyin CFRD in a narrow river is conducted with a new idea of taking the high toe wall as a non-stress vertical impervious structure and constituting the system with toe slab and face slab together. The three-dimensional static and dynamic finite element analyses for high toe wall are also conducted herein. The results show that the high toe wall can meet the design requirements in all design conditions. As an impervious structure, the high toe wall provides a new idea for CFRD design to deal with the issues of poor topographical and geological conditions.关键词
高趾墙/面板堆石坝/垂直防渗体/吉音水利枢纽工程Key words
high toe wall/face rockfill dam/vertical impervious/Jiyin Water Control Project分类
建筑与水利引用本文复制引用
李振纲..吉音水利枢纽工程混凝土面板坝高趾墙设计[J].水力发电,2011,37(10):44-47,4.