摘要

Abstract

The temperature acquisition system directly affects the safe and stable operation of generating units, and therefore, it is important to analyze the failures for improving the long-term stability and reliability of system. Focusing on the design and operation of temperature acquisition system in Huizhou Pumped-storage Power Station, the system defects are summarized, and the system is improved from temperature resistance selection, acquisition circuit design and acquisition device functions. The practice shows that the improved system is stable and effective.

关键词

温度采集系统/测温电阻/温度采集回路/温度采集装置/惠州抽水蓄能电站

Key words

temperature acquisition system/temperature resistance/temperature acquisition circuit/temperature acquisition device/Huizhou Pumped-storage Power Station