水利水电科技进展2011,Vol.31Issue(5):11-13,22,4.DOI:10.3880/j.issn.1006-7647.2011.05.003
考虑供水权重系数的水库群联合供水调度
Joint water supply operation of reservoir group considering weight coefficient of water supply
周芬 1郑雄伟 1马俊 1钟名军1
作者信息
- 1. 浙江省水利水电勘测设计院,浙江杭州310002
- 折叠
摘要
Abstract
A model for the joint water supply operation of multiple reservoirs was established. The model aimed to maximize the annual total water supply of the system, with the day regarded as the calculation interval, the daily water supply of the reservoirs as the decision variable, and the reservoir capacity, available water supply and guarantee rate of water supply as the constraint conditions. The model was solved by means of the simulation method. The method to calculate the weight coefficient of the joint water supply of the reservoirs was highlighted.关键词
水库群/联合供水/补偿调节/供水权重系数Key words
reservoir group/joint water supply/compensation adjustment/weight coefficient of water supply分类
建筑与水利引用本文复制引用
周芬,郑雄伟,马俊,钟名军..考虑供水权重系数的水库群联合供水调度[J].水利水电科技进展,2011,31(5):11-13,22,4.