江都抽水站更新改造工程技术

雍成林 朱承明

水利水电科技进展2011,Vol.31Issue(5):53-58,6.
水利水电科技进展2011,Vol.31Issue(5):53-58,6.DOI:10.3880/j.issn.1006-7647.2011.05.014

江都抽水站更新改造工程技术

Technical review of Jiangdu Pumping Station improvement project

雍成林 1朱承明1

作者信息

  • 1. 江苏省江都水利工程管理处,江苏江都225200
  • 折叠

摘要

Abstract

The main technical issues of Jiangdu Pumping Station improvement project were analyzed and summarized, including the promotion of flow regime in approach river of the pumping station, the selection of pump type and the change of flow channel, the selection of the bearing of the host group, the application of the bearing with new materials, the improvement of pump vane adjustment system, the design optimization of substation reconstruction, the utilization of high-capacity high-speed switching FSR, the option of three power generation stations and the innovation of automation system technology of the pumping station. The relevant countermeasures as well as the existing problems and disadvantages during the improvement process were put forward.

关键词

:泵站改造/设备更新/流道改造/江都抽水站

Key words

pumping station improvement/equipment innovation/change of flow channel/Jiangdu Pumping Station