In order to study the influence of blasting vibration effect on the lining behavior of an existing adjacent tunnel and to evaluate the safety involved, in-situ monitoring was carried out. Three items were conducted including tunnel lining deformations, concrete surface strains and vibration speeds under different explosive charge quantities. Results showed that the maxim compressive strain on the left arch springing was 20.69 \le, far less than specified limit 1400^,6. The maximum vibration speed was 0. 84 cm/s, less than specified limit lOcm/s. Blasting program met the relevant design requirements.

关键词

隧道/爆破振动/村砌应变/振动速度/变形监测

Key words

Tunnel/ Blasting vibration/ Lining strain/ Vibration speed/ Deformation monitoring