铁道标准设计Issue(11):89-92,96,5.
深圳地铁3号线广深铁路桥桩基托换工程设计
Underpinning Engineering Design for the Pile Foundation of Guangzhou-Shenzhen Railway Bridge on Shenzhen Metro Line 3
鲁雪冬 1毛学锋 1许智焰1
作者信息
- 1. 中铁二院工程集团有限责任公司土木建筑设计研究一院,成都610031
- 折叠
摘要
Abstract
Shenzhen Metro Line 3 passes through the Liberation Road section of Guangzhou - Shenzhen railway, underpinning should be carried out for the foundations of a continuous beam bridge and a continuous rigid frame bridge. The construction site features rich groundwater, limited space, poor geological conditions. Considering the difficulties of underpinning for the continuous beam bridge and continuous rigid pile bridge, the paper introduces the underpinning program, steps and treatment of the interaction of newly underpinned piles with overlapping tunnels, option for removing the old piles and construction monitoring requirements, and describes in-depth the auxiliary measures for underpinning and the major steps. The practice can be taken for reference by professional colleagues.关键词
桩基托换/连续刚构/临时支架/工程设计Key words
Pile foundation underpinning/Continuous rigid frame/Temporary support/Engineering design分类
交通工程引用本文复制引用
鲁雪冬,毛学锋,许智焰..深圳地铁3号线广深铁路桥桩基托换工程设计[J].铁道标准设计,2011,(11):89-92,96,5.