| 注册
首页|期刊导航|长江科学院院报|长江干支流水库群综合调度的多利益主体协调框架探讨

长江干支流水库群综合调度的多利益主体协调框架探讨

陈广才

长江科学院院报2011,Vol.28Issue(12):64-67,4.
长江科学院院报2011,Vol.28Issue(12):64-67,4.

长江干支流水库群综合调度的多利益主体协调框架探讨

The Coordination Frame for Integrated Dispatching of Large Cascade Reservoir Groups on Yangtze River

陈广才1

作者信息

  • 1. 长江科学院水资源综合利用研究所,武汉430010
  • 折叠

摘要

Abstract

Experiments on potherb mustard planted on floating-bed were performed to study the growth characteristic of potherb mustard and its capacity of absorbing Nitrogen and Phosphorus from eutrophic water body. Results showed that the potherb mustard on floating-bed had a fresh weight of 30 g, culm height of 15 cm and root length of 35 cm on average per plant. The amount of directly absorbed Nitrogen and Phosphorus amounted to 67.3 kg/hm2 and 4.8 kg/hm2 respectively. The results suggested that potherb mustard could grow well throughout the winter and was effective for eutrophic water purification. It is a new and alternative approach for the treatment of eutrophic water body in winter.

关键词

水库群/综合调度/协调/长江流域

Key words

potherb mustard/cultivation on floating-bed/growth characteristic/water purification

分类

建筑与水利

引用本文复制引用

陈广才..长江干支流水库群综合调度的多利益主体协调框架探讨[J].长江科学院院报,2011,28(12):64-67,4.

基金项目

长江科学院博士启动基金(CKSQ2010077) (CKSQ2010077)

长江科学院院报

OA北大核心CSCDCSTPCD

1001-5485

访问量0
|
下载量0
段落导航相关论文