| 注册
首页|期刊导航|电力系统自动化|计及异步化同步发电机的电网可靠性评估模型

计及异步化同步发电机的电网可靠性评估模型

赵渊 黄旭 谢开贵

电力系统自动化2011,Vol.35Issue(19):6-11,6.
电力系统自动化2011,Vol.35Issue(19):6-11,6.

计及异步化同步发电机的电网可靠性评估模型

A Reliability Evaluation Model for Power Systems Incorporating Asynchronized Generators

赵渊 1黄旭 1谢开贵1

作者信息

  • 1. 输配电装备及系统安全与新技术国家重点实验室,重庆大学,重庆市400044
  • 折叠

摘要

Abstract

Markov state transition processes for asynchronized generator (ASG) and conventional synchronous generator (SG) are presented by analyzing their different failure modes of the main functional parts of the excitation systems, and their reliability models are established respectively. In the optimal load shedding model based on the alternative current power flow, different influences on power system reliability are compared incorporating the active and reactive power decoupling control characteristic for ASG and the capacity limits for SG. The system reliability is studied when the practical operational constraints of SG are intensively considered. Finally, case studies using the RBTS and IEEE-RTS79 power systems show that ASG can obviously improve power system reliability.

关键词

异步化同步发电机/可靠性评估/有功与无功功率解耦

Key words

asynchronized generator (ASG)/reliability evaluation/decoupling of active power and reactive power

分类

信息技术与安全科学

引用本文复制引用

赵渊,黄旭,谢开贵..计及异步化同步发电机的电网可靠性评估模型[J].电力系统自动化,2011,35(19):6-11,6.

基金项目

输配电装备及系统安全与新技术国家重点实验室自主研究项目(2007DAl0512709103,2007DAl0512711208). ()

电力系统自动化

OA北大核心CSCDCSTPCD

1000-1026

访问量0
|
下载量0
段落导航相关论文