Abstract
HVDC system may cause sub-synchronous oscillation (SSO) occurred in thermal power units near rectifier station. To ensure secure and stable operation of AC/DC power transmission system from Hulun Buir to Liaoning, the possibly occurred subsynchronous oscillation (SSO) of turbogenerating units in Hulun Buir League, which might be caused by HVDC power transmission system from Hulun Buir to Liaoning, is studied by digital-analog hybrid simulator, and the risk of occurring SSO under different operation modes of AC/DC power transmission system from Hulun Buir to Liaoning is analyzed in depth, besides, the impacts of operating conditions of HVDC power transmission system on SSO are studied. The effectivity of adopting SSO damping controller in control system of HVDC power transmission project is verified by results of hybrid digital-analog hybrid simulation, and corresponding suggestions are given.关键词
直流输电/次同步振荡/数模混合实时仿真/次同步阻尼控制器Key words
HVDC power transmission/sub-synchronous oscillation (SSO)/digital-analog hybrid real-time simulation/sub-synchronous damping controller分类
信息技术与安全科学引用本文复制引用
刘翀,穆清,蒋卫平,陈凌芳,王明新,项祖涛..呼辽直流工程次同步振荡的数模混合仿真[J].电网技术,2011,35(10):47-52,6.