小水电系统单回并网线路故障时最大重合闸时间的确定

刘光晔 曾自强 毛弋 施海亮 唐海军 胡峰

电网技术2012,Vol.36Issue(1):241-245,5.
电网技术2012,Vol.36Issue(1):241-245,5.

小水电系统单回并网线路故障时最大重合闸时间的确定

Determination of Maximum Reclosure Time for Faulted Single Transmission Line Connecting Small HydroDower System With Power Grid

刘光晔 1曾自强 1毛弋 1施海亮 1唐海军 2胡峰2

作者信息

  • 1. 湖南大学电气与信息工程学院,湖南省长沙市410082
  • 2. 常德电业局,湖南省常德市415000
  • 折叠

摘要

Abstract

Due to the fault-caused trip out of single transmission line that connects the small hydropower system with power grid, the small hydropower system becomes an islanded system and a large amount of power surplus in the islanded system leads to low success rate of autoreclosure of the faulted line. For this reason, an approach to carry out the autoreclosure of such a transmission line is proposed: according to equal area criterion, the maximum allowed reclosure frequency and reclosure time can be calculated by which the system stability can be sustained, thus since the trip out of the single tie line, when the relative shifting of EMFs at both sides of the faulted line went through one or several integral periods and the amplitude of both EMFs are equal, the autoreclosure is put into force. Simulation results of actual system show that the theoretical analysis of the proposed approach and the calculation are correct. To maintain transient stability of small hydropower system, by means of adopting optimal reclosing-time capturing autoreclosure combined with the measure of high-frequency generator tripping the maximum permissible reclosure time between 4sec to 5sec can be achieved, thus the success rate of autoreclosure can be obviously improved. The proposed principle and approach are available for reference to technical renovation of autoreclosure devices for small hydropower systems.

关键词

孤岛系统/自动重合闸/最大合闸频率/最大允许合闸时问

Key words

island system/autoreclosure/maximumautoreclosure frequency/maximum permissible reclosure time