电网技术2012,Vol.36Issue(2):7-12,6.
溪洛渡-浙西±800kV特高压直流输电工程浙西换流站绝缘配合
Insulation Coordination for Zhexi Converter Station of ±800 kV DC Power Transmission Project From Xiluodu to Zhexi
摘要
Abstract
The insulation coordination of converter statiion for ±800 kV DC power transmission project is one of key techniques for the implementation of the project, and the insulation coordination will guide the design, type selection, manufacturing and testing of converter station equipments. Based on the insulation coordination method for UHVDC converter station, the insulation coordination of Zhexi converter station located at the inversion side of ±800 kV DC power transmission project from Xiluodu to Zhexi is researched, and the layout scheme of arresters installed in Zhexi converter station and corresponding arrester parameters and protection level are proposed, then based on the recommended insulation margin the insulation levels of converter station equipments are finally determined. The research results are available for reference to the construction of ±800 kV DC power transmission project from Xiluodu to Zhexi as well as the designs of other UHVDC power transmission projects.关键词
特高压直流/±800/kV换流站/绝缘配合/避雷器/绝缘水平Key words
UHVDC/±800 kV converter station/insulation coordination/arrester/insulation level分类
信息技术与安全科学引用本文复制引用
陈锡磊,周浩,王东举,沈扬,丁健,钱锋,周志超,丘文千..溪洛渡-浙西±800kV特高压直流输电工程浙西换流站绝缘配合[J].电网技术,2012,36(2):7-12,6.基金项目
国家重点基础研究发展计划项目(973项目)(2011CB209405). ()