溪洛渡-浙西±800kV特高压直流输电工程浙西换流站绝缘配合

陈锡磊 周浩 王东举 沈扬 丁健 钱锋 周志超 丘文千

电网技术2012,Vol.36Issue(2):7-12,6.
电网技术2012,Vol.36Issue(2):7-12,6.

溪洛渡-浙西±800kV特高压直流输电工程浙西换流站绝缘配合

Insulation Coordination for Zhexi Converter Station of ±800 kV DC Power Transmission Project From Xiluodu to Zhexi

陈锡磊 1周浩 1王东举 1沈扬 2丁健 2钱锋 2周志超 2丘文千2

作者信息

  • 1. 浙江大学电气工程学院,浙江省杭州市310027
  • 2. 浙江省电力设计院,浙江省杭州市310014
  • 折叠

摘要

Abstract

The insulation coordination of converter statiion for ±800 kV DC power transmission project is one of key techniques for the implementation of the project, and the insulation coordination will guide the design, type selection, manufacturing and testing of converter station equipments. Based on the insulation coordination method for UHVDC converter station, the insulation coordination of Zhexi converter station located at the inversion side of ±800 kV DC power transmission project from Xiluodu to Zhexi is researched, and the layout scheme of arresters installed in Zhexi converter station and corresponding arrester parameters and protection level are proposed, then based on the recommended insulation margin the insulation levels of converter station equipments are finally determined. The research results are available for reference to the construction of ±800 kV DC power transmission project from Xiluodu to Zhexi as well as the designs of other UHVDC power transmission projects.

关键词

特高压直流/±800/kV换流站/绝缘配合/避雷器/绝缘水平

Key words

UHVDC/±800 kV converter station/insulation coordination/arrester/insulation level

分类

信息技术与安全科学

引用本文复制引用

陈锡磊,周浩,王东举,沈扬,丁健,钱锋,周志超,丘文千..溪洛渡-浙西±800kV特高压直流输电工程浙西换流站绝缘配合[J].电网技术,2012,36(2):7-12,6.

基金项目

国家重点基础研究发展计划项目(973项目)(2011CB209405). ()

电网技术

OA北大核心CSCDCSTPCD

1000-3673

访问量0
|
下载量0
段落导航相关论文