电子科技2011,Vol.24Issue(10):136-137,139,3.
火电项目后评价方法及应用
Evaluation of Thermal Power Post Project and its Application
冯志广1
作者信息
- 1. 华北电力大学机械系,河北保定102206
- 折叠
摘要
Abstract
Along with the consistently deepening investment management of the infrastructure project of the country,the post-project evaluation has become an important means for measuring the decision-making level.The post-project evaluation of the thermal power construction is necessary to be done after thermal power plants and regional power generating companies have put the project into operation.Through the introduction of the post-evaluation method and the conclusion of the practical application,the text has provided methods for the operation of the post-evaluation of the thermal power project.关键词
火电项目/立项决策/后评价方法Key words
thermal power project/project preparation/after the evaluation method分类
信息技术与安全科学引用本文复制引用
冯志广..火电项目后评价方法及应用[J].电子科技,2011,24(10):136-137,139,3.