高压电器2011,Vol.47Issue(12):1-5,5.
并联电容器组分闸重燃过电压仿真
Simulation of Restrike Overvoltage Due to Switching off Shunt Capacitor Bank
摘要
Abstract
Shunt capacitor banks are widely used in power grid for reactive power compensation. However, the operating overvoltage caused by frequent operation of shunt capacitor bank would damage the insulated equipment and decrease the reliability of power system. The operation overvoltage on shunt capacitor bank is mainly referred to the restrike in switching-off action, while switching-on action usually does not generate the overvoltage which harms capacitor's insulation. In this paper, a model is designed by adding a normal closed breaker for simulating the overvoltage due to switching off shunt capacitor bank by a vacuum circuit breaker, and the restrike overvoltage is calculated with the model. Moreover, the effect of limiting restrike overvoltage on shunt capacitor bank by using an MOA arrester is simulated. Simulation results show the proposed method is feasible.关键词
并联电容器/重燃过电压/金属氧化物避雷器Key words
shunt capacitor bank/restrike overvoltage/MOA arrester分类
信息技术与安全科学引用本文复制引用
张森峰,商立群..并联电容器组分闸重燃过电压仿真[J].高压电器,2011,47(12):1-5,5.基金项目
教育部留学回国人员科研基金项目(教外司[2008]890) (教外司[2008]890)
陕西省教育厅专项科研计划项目(09JK581). (09JK581)