Abstract

Due to inadequate power system peaking capacity and local loads for significant waving photovoltaic power penetration,a lot of photovoltaic power is wasted during valley load periods.To ensure the normal operation of power grids,a generation maintenance scheduling model with significant photovoltaic power penetration is presented,considering the different output characteristics of photovoltaic power in different types of units with different peak capability.The waste photovoltaic power during valley load periods is reduced and the safety and economic operation of power grids is improved by reserving reasonable peaking capacity when maintenance is scheduled.An effective modeling method is designed,transforming the probability integration objective function into mixed-integer programming problem by numerical integration method.The analysis and discussions on the results of numerical examples verify the feasibility and validity of the model.

关键词

光伏发电/发电机组/检修计划/非线性规划

Key words

photovoltaic generation/generating set/turnaround plan/nonlinear programming