摘要

Abstract

The vertical deformation difference of a high -rise building was analyzed combining with Shanghai Tower,of which roof is 580 meters high, according to construction sequence and provisions about concrete creep and shrinkage in CEB-FIP 1990 code. In analysis,the factors such as creep and shrinkage of concrete, construction adjustment,fix time of outriggers, and preset of steel components and etc. were all considered. The results of analysis indicated that mega columns will reach the maximum vertical deformation of 123 mm,while reinforced concrete core shear wall will occurr the maximum vertical deformation of 141 mm on the 84' floor one year after the structure roof is constructed. The maximum vertical deformation difference between mega columns and shear walls will happen on 101th floor, which is about 22 mm. Meanwhile,more researches have been carried on in the field of calculation assumptions with effects on vertical deformation, and advices in accordance with engineering practice have been given. It was pointed out that internal force in outriggers could be reduced by delaying the fix time.

关键词

超高层结构/竖向变形/收缩/徐变/施工过程/伸臂桁架/预调

Key words

super high-rise building/vertical deformation/shrinkage, creep/construction process/outrigger/preset/