沪宁高速铁路下承式系杆拱桥钢管拱肋施工
Steel Tube Rib Construction for Through-type Tied Arch Bridge in Shanghai-Nanjing High-speed Railway
张全文 1陶绍钧2
作者信息
- 1. 西南交通大学峨眉校区土木工程系,四川峨眉山614202
- 2. 西南交通大学土木工程学院,成都610031
- 折叠
摘要
Abstract
Concrete-filled steel tube rib solved two problems of the application of high-strength material in arch bridge and the construction with less supports, which has been rapidly developed in bridge. Through the example of large bridge across highway in Shanghai-Nanjing High-speed Railway, the construction technology,process and difficulties of concrete-filled steel tube rib for through-type tied arch bridge are discussed. It been proven from practice that the construction technology not only ensured engineering quality, but also shortened construction period.关键词
钢管混凝土/下承式系杆拱桥/拱肋Key words
concrete-filled steel tube/through-type tied arch bridge/arch rib分类