| 注册
首页|期刊导航|路基工程|沪宁高速铁路下承式系杆拱桥钢管拱肋施工

沪宁高速铁路下承式系杆拱桥钢管拱肋施工

张全文 陶绍钧

路基工程Issue(6):119-120,123,3.
路基工程Issue(6):119-120,123,3.

沪宁高速铁路下承式系杆拱桥钢管拱肋施工

Steel Tube Rib Construction for Through-type Tied Arch Bridge in Shanghai-Nanjing High-speed Railway

张全文 1陶绍钧2

作者信息

  • 1. 西南交通大学峨眉校区土木工程系,四川峨眉山614202
  • 2. 西南交通大学土木工程学院,成都610031
  • 折叠

摘要

Abstract

Concrete-filled steel tube rib solved two problems of the application of high-strength material in arch bridge and the construction with less supports, which has been rapidly developed in bridge. Through the example of large bridge across highway in Shanghai-Nanjing High-speed Railway, the construction technology,process and difficulties of concrete-filled steel tube rib for through-type tied arch bridge are discussed. It been proven from practice that the construction technology not only ensured engineering quality, but also shortened construction period.

关键词

钢管混凝土/下承式系杆拱桥/拱肋

Key words

concrete-filled steel tube/through-type tied arch bridge/arch rib

分类

交通工程

引用本文复制引用

张全文,陶绍钧..沪宁高速铁路下承式系杆拱桥钢管拱肋施工[J].路基工程,2011,(6):119-120,123,3.

路基工程

1003-8825

访问量0
|
下载量0
段落导航相关论文