摘要

Abstract

Taking Gequan Coal Mine as example,the paper proposed an improved scheme of automation technology of 35/6 Kv coal mine substation. Through reform of integrated automation,the substation realizes functions of relay protection and control,remote operation,metering,fault recording,data processing and five anti-lock operation,on-line monitoring,which meets with need for later post-expansion and reform of substation line.

关键词

煤矿变电站/自动控制/35/6 kV/自动化改造

Key words

coal mine substation/automatic control/35/6 kV/automation reform