| 注册
首页|期刊导航|水力发电|水电工程建设项目中甲供材料的管理

水电工程建设项目中甲供材料的管理

汪蔚荣 张小芳

水力发电2011,Vol.37Issue(11):7-8,17,3.
水力发电2011,Vol.37Issue(11):7-8,17,3.

水电工程建设项目中甲供材料的管理

Management on Owner-supplied Materials in the Construction of Hydropower Projects

汪蔚荣 1张小芳1

作者信息

  • 1. 黄河上游水电开发有限责任公司工程建设分公司,青海西宁810000
  • 折叠

摘要

Abstract

The cost of materials supplied by owner in the construction of hydropower projects has a larger proportion to total investment. The issues in the management of owner-supplied materials are analyzed from the aspects of contract base prices, accounting methods and process management, and the solutions are also proposed based on the actual experiences. The management practices will provide references to owner-supplied material management and investment control in the future.

关键词

甲供材料/水电管理/工程投资

Key words

material supply by owner/ hydropower management/ project investment

分类

建筑与水利

引用本文复制引用

汪蔚荣,张小芳..水电工程建设项目中甲供材料的管理[J].水力发电,2011,37(11):7-8,17,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文