水力发电2011,Vol.37Issue(11):43-45,3.
积石峡水电站电气主接线方案选择
Selection of Main Electrical Connection Program for Jishixia Hydropower Station
杨军 1罗海 2杨丽薇2
作者信息
- 1. 黄河上游水电开发有限责任公司工程建设分公司,青海西宁810000
- 2. 中国水电顾问集团西北勘测设计研究院,陕西西安710065
- 折叠
摘要
Abstract
Three programs of main electrical connection for Jishixia Hydropower Station are compared from the reliability, economy and sensitivity analyses and the probability calculation of connectivity. These quantitative analyses provide basis for the selection of main electrical connection, and can be as references for other projects.关键词
电气主接线/可靠性/定量分析/积石峡水电站Key words
main electrical connection/ reliability/ quantitative analysis/ Jishixia Hydropower Station分类
信息技术与安全科学引用本文复制引用
杨军,罗海,杨丽薇..积石峡水电站电气主接线方案选择[J].水力发电,2011,37(11):43-45,3.