| 注册
首页|期刊导航|水力发电|渡吊技术在积石峡水电站水轮机座环吊装中的应用

渡吊技术在积石峡水电站水轮机座环吊装中的应用

李永强 张春海 王英

水力发电2011,Vol.37Issue(11):81-82,86,3.
水力发电2011,Vol.37Issue(11):81-82,86,3.

渡吊技术在积石峡水电站水轮机座环吊装中的应用

Application of Crossing-hanging-lifting Technology in the Installation of Stay Ring for Jishixia Hydropower Station

李永强 1张春海 2王英3

作者信息

  • 1. 中国水利水电第十工程局机电安装分局,青海循化811100
  • 2. 黄河上游水电开发有限责任公司工程建设分公司,青海西宁810000
  • 3. 中国水利水电第四工程局机电安装分局,青海循化811100
  • 折叠

摘要

Abstract

In the early construction period of large and medium-sized hydropower stations, the installation of stay ring of turbine is a problem because there is no bridge crane or the lifting equipments in situ which can meet the requirements. This problem is also faced in the installation of stay rings in Jishixia Hydropower Station. After scientific calculation and careful organization, the crossing-hanging-lifting technology with a herringbone bridging is used to install the stay rings of three units. The installations are successful and guarantee the installation duration.

关键词

水轮机/座环/渡吊技术/积石峡水电站

Key words

turbine/ stay ring/ crossing-hanging-lifting technology/ Jishixia hydropower Station

分类

能源科技

引用本文复制引用

李永强,张春海,王英..渡吊技术在积石峡水电站水轮机座环吊装中的应用[J].水力发电,2011,37(11):81-82,86,3.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文