水力发电2011,Vol.37Issue(11):83-86,4.
积石峡水电站超大型弧门安装工艺与质量控制
Process and Quality Control for Extra-large Radial Gate Installation in Jishixia Hydropower Station
柳晓龙 1薛伟伟 2陈海龙2
作者信息
- 1. 中国水利水电第四工程局有限公司第一分局,青海西宁810006
- 2. 黄河上游水电开发有限责任公司工程建设分公司,青海西宁810000
- 折叠
摘要
Abstract
Because the unconventional method and a variety of welding deformation controls will be used in the installation of extra-large radial gate for Jishixia Hydropower Station, the whole installation process including combination, assembly and welding is studied. By reserving contraction and anti -deformation margins, reinforcing, selecting reasonable welding method and adjusting welding sequence, the installation quality is guaranteed and the investment is saved. The conflict between civil engineering and metal structure constructions is solved and the construction duration is also shortened.关键词
超大弧门/安装工艺/质量控制/积石峡水电站Key words
extra-large radial gate/ installation process/ quality control/ Jishixia Hydropower Station分类
建筑与水利引用本文复制引用
柳晓龙,薛伟伟,陈海龙..积石峡水电站超大型弧门安装工艺与质量控制[J].水力发电,2011,37(11):83-86,4.