首页|期刊导航|水力发电|丰满水电站新坝基坑开挖爆破对老坝稳定性的影响分析

丰满水电站新坝基坑开挖爆破对老坝稳定性的影响分析

卢云香 王刚 马震岳

水力发电2011,Vol.37Issue(12):31-33,3.
水力发电2011,Vol.37Issue(12):31-33,3.

丰满水电站新坝基坑开挖爆破对老坝稳定性的影响分析

Influence of New Dam Foundation Pit Blasting on Old Dam Stability of Fengman Hydropower Station

卢云香 1王刚 1马震岳1

作者信息

  • 1. 大连理工大学建设工程学部水利工程学院,辽宁大连116024
  • 折叠

摘要

Abstract

By using display dynamic finite element (LS-DYNA) method, the dynamic responses for constructing old dam and other main structures under blasting vibration load of the foundation pit excavation for constructing new dam is calculated for Fengman Hydropower Station. The vibration response control standards are determined according to rock plug blasting data in Fengman area and the experiences of other similar blasting engineering. The safety of old dam and other structures are assessed and a reasonable amount of blasting single fire dynamite is also determined. The calculation results show that the proposed largest single fire dynamite can meet the safety requirements of blasting, and the blasting vibration just has a small impact on the old dam and the sliding stability is guaranteed.

关键词

基坑/爆破振动/控制标准/动力计算/新坝/老坝/丰满水电站

Key words

foundation pit/ blasting vibration/ control standard/ dynamic calculation/ new dam/ old dam/ Fengman Hydropower Station

分类

建筑与水利

引用本文复制引用

卢云香,王刚,马震岳..丰满水电站新坝基坑开挖爆破对老坝稳定性的影响分析[J].水力发电,2011,37(12):31-33,3.