水力发电2012,Vol.38Issue(1):47-49,3.
桐子林水电站导流明渠大体积混凝土温度控制措施
Temperature Control of Mass Concrete in Diversion Channel of Tongzilin Hydropower Station
郭建和1
作者信息
- 1. 中国人民武装警察部队水电第三总队第九支队,四川成都611130
- 折叠
摘要
Abstract
Tongzilin Hydropower Station locates at the area with larger temperature difference between day and night and higher temperature in summer. To prevent crack in the concrete pouring of diversion channel, the measures are undertaken during construction, including lowering hydration heat, controlling concrete temperature at the outlet of batch plant, lowering concrete temperature during placing and pouring, concrete surface curing and protection, and water cooling. No crack is found after completion.关键词
大体积混凝土/温度控制/混凝土施工/桐子林水电站Key words
mass concrete/ temperature control/ concrete construction/ Tongzilin Hydropower Station分类
建筑与水利引用本文复制引用
郭建和..桐子林水电站导流明渠大体积混凝土温度控制措施[J].水力发电,2012,38(1):47-49,3.