| 注册
首页|期刊导航|水力发电|泸定水电站防渗墙下深厚覆盖层帷幕灌浆施工技术

泸定水电站防渗墙下深厚覆盖层帷幕灌浆施工技术

李伟 郑远建

水力发电2012,Vol.38Issue(1):54-56,62,4.
水力发电2012,Vol.38Issue(1):54-56,62,4.

泸定水电站防渗墙下深厚覆盖层帷幕灌浆施工技术

Curtain Grouting for Deep Overburden under the Cut-off Wall of Luding Hydropower Station

李伟 1郑远建1

作者信息

  • 1. 中国人民武装警察部队水电第三总队第九支队,四川成都610036
  • 折叠

摘要

Abstract

The section of Luding Dam on main river bed is 100.54 m length and the suspended cut-off wall with a maximum depth of 110 m is used to control seepage. The curtain grouting in overburden under the cut-off is conducted, in which, the curtain grouting holes penetrate into the bedrock about 10 m and the maximum hole depth is 154.8 m. As the complex structure and strong permeability of overburden, the pore-forming rate is low and the grouting effect is difficult to guarantee. The curtain grouting are summarized herein from drilling control, slurry composition and mix ratio, grouting pressure selection, grouting completion standard and quality inspection.

关键词

防渗墙/帷幕灌浆/覆盖层/施工技术/泸定水电站

Key words

cutoff wall/ curtain grouting/ overburden/ construction technology/ Luding Hydropower Station

分类

建筑与水利

引用本文复制引用

李伟,郑远建..泸定水电站防渗墙下深厚覆盖层帷幕灌浆施工技术[J].水力发电,2012,38(1):54-56,62,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文