水力发电学报2011,Vol.30Issue(4):42-48,7.
乌江梯级水库群优化调度规律研究
Study on the optimal operation rules of cascade reservoirs in Wujiang Basin
摘要
Abstract
To obtain the optimal dispatching rules that are important to the operation of cascade reservoirs in Wujiang basin,this paper uses probability statistics and correlation analysis technique to analyze the data calculated for the design of compromise guaranteed output for energy maximization,uses empirical frequency to analyze the water level variation,and then establishes a correlation chart between time-average output and available water.With this chart,the power generation rules for each reservoir during various dispatching periods can be easily determined.This approach is effective in revealing the potential rules underneath the long-term operation data of cascade reservoirs,and its application to Wujing basin provided a theoretic support for optimal operation.关键词
梯级水库群/概率统计法/相关分析法/水位变化规律/发电规则Key words
cascade reservoirs/probability statistics/correlation analysis/water level variational rules/power generation rules分类
建筑与水利引用本文复制引用
黄强,高凡,张永永,孙晓懿,吴成国..乌江梯级水库群优化调度规律研究[J].水力发电学报,2011,30(4):42-48,7.基金项目
国家重点基础研究发展计划 ()
水利部公益基金 ()