| 注册
首页|期刊导航|水利信息化|江垭大坝抬升资料分析及初步建模

江垭大坝抬升资料分析及初步建模

杨威 廖文嘉 黄立波

水利信息化Issue(5):16-20,5.
水利信息化Issue(5):16-20,5.

江垭大坝抬升资料分析及初步建模

Analysis of Materials on Lifting-up of Rock Mass and Preliminary Model Establishment of Jiangya Dam

杨威 1廖文嘉 1黄立波1

作者信息

  • 1. 湖南澧水流域水利水电开发有限公司,湖南长沙410000
  • 折叠

摘要

Abstract

Since water impoundment and operation at the end of 1998, and because of specific lithologic charactersof D2y rock stratum, the deep layer of Jiangya dam bedrock, have caused infrequent lifting-up of rock mass. Through an analysis about geological characteristics of dam location and lifting-up theory, and statistical analysis on monitoring data of more than ten years, the paper suggests that lifting-up of rock mass is caused by the secular distortion formed by D2y rock stratum under sustained action of higher water head. Although there still exists the lifting-up, there is a finite span for aggravation.

关键词

江垭大坝/抬升/D2y岩层/统计建模/时效变形/资料分析

Key words

Jiangya dam/lifting-up of rock mass/D2y rock stratum/statistics modeling/secular distortion/materials analysis

分类

建筑与水利

引用本文复制引用

杨威,廖文嘉,黄立波..江垭大坝抬升资料分析及初步建模[J].水利信息化,2011,(5):16-20,5.

水利信息化

1674-9405

访问量0
|
下载量0
段落导航相关论文