| 注册
首页|期刊导航|水利学报|大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题

大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题

武新宇 程春田 申建建 唐红兵

水利学报2012,Vol.43Issue(1):31-42,12.
水利学报2012,Vol.43Issue(1):31-42,12.

大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题

Short-term optimal operation methods of large-scale hydropower plants Ⅲ. Solution method of peak load regulation for multiple power grid

武新宇 1程春田 1申建建 1唐红兵2

作者信息

  • 1. 大连理工大学水电与水信息研究所,辽宁大连116024
  • 2. 中国南方电网电力调度通信中心,广东广州510623
  • 折叠

摘要

Abstract

With the development of the scale of power grids and hydropower systems in China, the problem of peak load regulation for multiple power grid will be more and more prominent. On the background of hydropower system of China Southern Grid (CSG), a peak load regulation model for multiple power grid with large scale hydropower systems is proposed. Aggregated function and multi-objective fuzzy optimization model are adopted to establish a fungible objective. A successive associated search method is proposed to address the problem of many time coupling constraints. Practice operation study shows that the method yield practicable results, and is feasible to peak load regulation problems for multi power grid.

关键词

巨型梯级水电站群/优化调度/短期/调峰/多目标

Key words

huge cascaded hydropower systems/optimal operation/short term/peak load regulation/multi objective

分类

建筑与水利

引用本文复制引用

武新宇,程春田,申建建,唐红兵..大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题[J].水利学报,2012,43(1):31-42,12.

基金项目

国家杰出青年科学基金 ()

国家自然科学基金项目 ()

水利学报

OA北大核心CSCDCSTPCD

0559-9350

访问量0
|
下载量0
段落导航相关论文