水利学报2012,Vol.43Issue(1):31-42,12.
大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题
Short-term optimal operation methods of large-scale hydropower plants Ⅲ. Solution method of peak load regulation for multiple power grid
摘要
Abstract
With the development of the scale of power grids and hydropower systems in China, the problem of peak load regulation for multiple power grid will be more and more prominent. On the background of hydropower system of China Southern Grid (CSG), a peak load regulation model for multiple power grid with large scale hydropower systems is proposed. Aggregated function and multi-objective fuzzy optimization model are adopted to establish a fungible objective. A successive associated search method is proposed to address the problem of many time coupling constraints. Practice operation study shows that the method yield practicable results, and is feasible to peak load regulation problems for multi power grid.关键词
巨型梯级水电站群/优化调度/短期/调峰/多目标Key words
huge cascaded hydropower systems/optimal operation/short term/peak load regulation/multi objective分类
建筑与水利引用本文复制引用
武新宇,程春田,申建建,唐红兵..大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题[J].水利学报,2012,43(1):31-42,12.基金项目
国家杰出青年科学基金 ()
国家自然科学基金项目 ()