水资源保护2011,Vol.27Issue(6):24-27,4.DOI:10.3969/j.issn.1004-6933.2011.06.006
咸潮影响下磨刀门水道取淡时机初探
A preliminary study on fresh water extraction time under influence of salt tide in Modaomen Channel
摘要
Abstract
Based on analysis of the data measured in dry seasons from 2005 to 2010 in the Modaomen Channel, the concepts of the first day of fresh water extraction and the last day of fresh water extraction are proposed. The relationships between the first day of fresh water extraction and the day with the maximum tidal range, and between the last day of freshwater extraction and the day with the minimum tidal range, are discussed. The results show the following: According to the day with the maximum tidal range, the first day of fresh water extraction has a delaying trend month by month in dry seasons, and the runoff for salinity control should generally arrive at Sixianjiao the day before the first day of fresh water extraction in the tidal period. There is a complex relationship between the last day of fresh water extraction and the day with the minimum tidal range. It is suggested that the salinity control time should be adjusted according to the existing conditions, and the runoff for salinity control should arrive at Sixianjiao two or three days before the last day of fresh water extraction in the tidal period and last about two days.关键词
磨刀门水道/咸潮/潮汐/取淡时机/珠江Key words
Modaomen Channel/ salt tide/ tide/ fresh water extraction time/ Pearl River分类
建筑与水利引用本文复制引用
孔兰,陈晓宏,刘斌,陈栋为,杜建..咸潮影响下磨刀门水道取淡时机初探[J].水资源保护,2011,27(6):24-27,4.基金项目
国家自然科学基金(50839005)、国家重点基础研究发展计划(973)(2010CB428405)、中山大学优秀研究生导师逸仙创新人才培养计划(2010) (50839005)