基于西霞院反调节补偿作用的小浪底水电站短期调峰运行研究
Research on Short-Term Peak Load Operation in Xiaolangdi Hydropower Station Based on Anti-Regulation Compensation of Xixiayuan
摘要
Abstract
Based on the analysis of the peak load operation of hydropower station and combined with the practical operation situation, the different peak load operations of Xiaolangdi-before and after the operation of Xixiayuan reservoir-are discussed in this paper. The peaking model of Xiaolangdi hydropower station by anti-regulation compensation of Xixiayuan is established. The comprehensive peaking capacity of Xiaolangdi is gained from the calculated results of the model, on the basis of which daily general peaking load plan and daily joint peaking load plan of Xiaolangdi are formulated. The analysis and comparison of the results indicates that the joint peaking operation has obviously enhanced the peaking capacity of Xiaolangdi. On the basis of meeting both the water dispatching directive and power dispatching directive, annul structure of peaking power is optimized, whereby improving the water resources use efficiency and raising the economic returns of power generation enterprises.关键词
调峰运行/反调节作用/调峰能力/小浪底水电站/西霞院Key words
peaking load operation/ anti-regulation/ peaking capacity/ Xiaolangdi hydropower station/ Xixiayuan分类
管理科学引用本文复制引用
白涛,畅建霞,方建熙..基于西霞院反调节补偿作用的小浪底水电站短期调峰运行研究[J].西安理工大学学报,2011,27(4):440-445,6.基金项目
国家重点基础研究发展计划基金资助项目(2011 CB403306) (2011 CB403306)
国家公益性行业科研专项基金资助项目(201001012、201 101043、201101049-01) (201001012、201 101043、201101049-01)
国家科技重大专项基金资助项目(2009ZX07212-002-003-004). (2009ZX07212-002-003-004)