This paper proposes a real life problem of optimization of production process: optimization of production process based on Time constraint. According to custom's demand, it needs to complete the productive task of designated work pieces in a strict time window. The real life problem is originated form the produce demand. The objective is to minimize the total cost of production process, satisfying the time constraint. In this paper, the real life problem is formulated as an integer programming model. As a case study, a software package(Cplex 9. 0) is applied for the production process of slave cylinder in some manufactory.

关键词

运筹学/生产过程优化/时间约束/Cplex

Key words

operations research/ optimization of production process/ time constraint/ cplex

分类

管理科学

引用本文复制引用

吴瀛峰,李宏楼,王大伟..基于时间约束的生产过程优化问题研究[J].运筹与管理,2011,(6):205-209,5.

基金项目

博士后科研基金资助项目(GYYJ-2011-009) (GYYJ-2011-009)

运筹与管理

OA北大核心CHSSCDCSCDCSTPCD

1007-3221

访问量0
|
下载量0
段落导航相关论文