岩土工程学报2011,Vol.33Issue(12):1950-1956,7.
徐家汇地铁站深基坑降水数值模拟与沉降控制
Numerical simulation of deep foundation pit dewatering and land subsidence control of Xujiahui Metro Station
摘要
Abstract
The buried depth of groundwater level is fairly shallow in Shanghai,and pit dewatering measures are mostly adopted in construction of metro stations.This study refers to the deep foundation pit dewatering project of Xujiahui Station of Shanghai Metro Line No.11.According to the site conditions of engineering geology and hydrogeology,design depth of enclosure structure and pit excavation of metro station,a numerical model of groundwater seepage is established.Through the inversion of permeability parameters based on the field pumping tests,the three-dimensional finite difference method is used to simulate the pit dewatering considering the initial and boundary conditions.The numerical results are consistent with the actual monitoring data of groundwater level.At the same time,the land subsidence induced by dewatering is calculated.The results indicate that the land subsidence around the pit can be controlled effectively.关键词
上海地铁/深基坑/降水/数值模拟/地面沉降Key words
Shanghai Metro/deep foundation pit/dewatering/numerical simulation/land subsidence分类
建筑与水利引用本文复制引用
周念清,唐益群,娄荣祥,江思珉..徐家汇地铁站深基坑降水数值模拟与沉降控制[J].岩土工程学报,2011,33(12):1950-1956,7.基金项目
国家自然科学基金项目 ()