岩土工程学报2012,Vol.34Issue(1):158-165,8.
盾构侧穿邻近古建筑的施工影响分析及保护措施加固效果的研究
Influences of construction of side-crossing shield tunnel on adjacent ancient architectures and reinforcement effect of protection measures
摘要
Abstract
Based on the side-crossing construction of Shanghai Metro line No. 11 close to the ancient architectures, numerical simulation and field monitoring are employed to study the settlement of the adjacent ancient architectures induced by the construction of MJS piles and the side-crossing of newly shield-driven tunnel. The influences on the buildings during the whole construction process can be divided into three stages: disturbance of pre-reinforced piles and crossing of up and down lines. The stage of pre-construction of MJS piles has the most remarkable impact. Due to the protection of MJS piles, the stages of crossing of up and down lines have the second largest and the smallest impacts, respectively. In addition, because of the construction of piles and the existing buildings at the left side of the tunnel, the settlement trough differs from the traditional one, and the distribution of horizontal displacement obviously changes. Moreover, due to the protection of isolation piles, the settlement produced by shield driving greatly decreases. Finally, the field monitoring data agree with the numerical results. The accuracy and rationality of the numerical simulation method is validated.关键词
MJS桩基/侧穿/古建筑/沉降/现场实测/数值模拟Key words
MJS pile/side-crossing/ancient architecture/settlement/field monitoring/numerical simulation分类
建筑与水利引用本文复制引用
吴昌将,张子新,丁文其,张登雨..盾构侧穿邻近古建筑的施工影响分析及保护措施加固效果的研究[J].岩土工程学报,2012,34(1):158-165,8.基金项目
长江学者和创新团队发展计划资助项目(IRT1029) (IRT1029)