基于模糊机会约束规划的水火电力系统多目标随机调度模型

吴杰康 唐力

中国电机工程学报2011,Vol.31Issue(25):26-34,9.
中国电机工程学报2011,Vol.31Issue(25):26-34,9.

基于模糊机会约束规划的水火电力系统多目标随机调度模型

Multi-objective Stochastic Scheduling Models for Hydrothermal Plants Based on Fuzzy Chance Constrained Programming

吴杰康 1唐力2

作者信息

  • 1. 广东工业大学自动化学院,广东省广州市510006
  • 2. 广西右江水利开发有限责任公司,广西壮族自治区南宁市530026
  • 折叠

摘要

Abstract

A stochastic scheduling model for hydrothermal power systems is presented based on fuzzy chance constrained programming, taking reservoir inflow and water level for a random variable. Reservoir water volume at the initial hour was formulated as a triangular fuzzy number, representing forecasting errors of reservoir water level. Aiming to represent stochastic variable characteristics due to historical data errors, fuzzy stochastic variables were used to represent the uncertainties incurred in optimization scheduling of hydrothermal power systems. A control function was introduced to coordinate the three objective functions, which includes coal consumption minimization, reservoir water level maximization and air pollutant emission minimization. A stochastic scheduling model of hydrothermal power systems can be converted into a determined form using fuzzy chance constrained programming and random chance constrained programming. A system with 8 cascaded plants and 6 coal-fired plants was taken as a study example and the results show that the model is correct.

关键词

水火电力系统/随机调度/模糊机会约束规划/随机变量

Key words

hydrothermal power system/stochastic scheduling/fuzzy chance constrained programming/stochastic variable

分类

动力与电气工程

引用本文复制引用

吴杰康,唐力..基于模糊机会约束规划的水火电力系统多目标随机调度模型[J].中国电机工程学报,2011,31(25):26-34,9.