高压电器2012,Vol.48Issue(4):115-118,4.
一起220kV变压器绕组短路损坏事故分析
Analvsis of a 220 kV Transformer Windings Breakage Fault Caused by Short-circuit
高树国 1张扬 2陈志勇 1潘瑾 1刘宏亮1
作者信息
- 1. 河北省电力研究院,石家庄050021
- 2. 江苏省电力公司检修分公司盐城分部,盐城224002
- 折叠
摘要
Abstract
The paper introduces a 220 kV transformer windings breakage fault which caused by low-voltage switch cabinet inner short-circuit. In order to check the damage extent of the windings, winding resistance test, oil chromatographic analysis and frequency-scan response analysis (FRA) are implemented. The conclusion reached by analyzing the test data is that the low-voltage windings of the transformer is deformated and the phase C winding is broken, then the conclusion is proved to be corrert by disintegrate result. At last, the reasons of the fault are comprehensive analyzed, and the preventive measures are given.关键词
变压器/短路/绕组变形Key words
transformer/ short-circuit/ wingding deformation分类
信息技术与安全科学引用本文复制引用
高树国,张扬,陈志勇,潘瑾,刘宏亮..一起220kV变压器绕组短路损坏事故分析[J].高压电器,2012,48(4):115-118,4.