工矿自动化2012,Vol.38Issue(2):26-29,4.DOI:32-1627/TP.20120113.1301.008
煤矿压风机组调度模型的研究
Research of Dispatching Model of Coal Mine Air Compressor Unit
卢如意 1史志鹏 2胡志强3
作者信息
- 1. 上海大屯能源股份有限责任公司江苏分公司,江苏徐州 221611
- 2. 中国电子科技集团公司第三十三研究所,山西太原 030006
- 3. 中国矿业大学信电学院,江苏徐州 221008
- 折叠
摘要
Abstract
In view of problem of higher electricity consumption of air compressor, the paper proposed an optimal control scheme of air compressor unit, namely building dispatching model of air compressor unit to realize goal of constant-pressure and energy-saving. Optimal control principle of the model is as follows: when pipe network pressure changes, making constant-pressure decision, energy-saving decision and distribution decision for situation of each air compressor in air compressor unit to maintain network pressure in 0.58-0.65 Mpa. The test result validated feasibility of the model.关键词
煤矿压风机/调度模型/管网压力/恒压/节能Key words
coal mine air compressor/dispatching model/pipe network pressure/constant-pressure/energy-saving分类
矿业与冶金引用本文复制引用
卢如意,史志鹏,胡志强..煤矿压风机组调度模型的研究[J].工矿自动化,2012,38(2):26-29,4.