| 注册
首页|期刊导航|南方电网技术|500kV天金线跳闸故障分析及防范措施

500kV天金线跳闸故障分析及防范措施

陈显坤 高虹亮 郑扬亮

南方电网技术2011,Vol.5Issue(z1):107-109,3.
南方电网技术2011,Vol.5Issue(z1):107-109,3.

500kV天金线跳闸故障分析及防范措施

Analysis on the Tripping Fault of 500 kV Tianshengqiao-Jinzhou Transmission Line and Related Preventive Measures

陈显坤 1高虹亮 2郑扬亮1

作者信息

  • 1. 中国南方电网超高压输电公司天生桥局,贵州兴义,562400
  • 2. 三峡大学电气与新能源学院,湖北宜昌443002
  • 折叠

摘要

Abstract

Based on the trip fault of Tianshcnqiao-Jinzhou 500 kV transmission line, this paper analysed the accident tower design parameters and geographical characteristics, calculated the lightning resisting level and checked the windage yaw angle, then found that the trip-out accident caused mainly by windage yaw flashover. It is suggested that it should take the preventive measures of adding on the insulator string of one insulator, and changing the L form league board to the carrying-on form league board, also hanging heavy hammers. These preventive measures can improve line insulation level, also have certain effect to guard against lightning failures.

关键词

高压直流/雷击故障/风偏闪络/防范措施

Key words

HVDC/ lighting failure/ windage yaw flashover, preventive measure

分类

信息技术与安全科学

引用本文复制引用

陈显坤,高虹亮,郑扬亮..500kV天金线跳闸故障分析及防范措施[J].南方电网技术,2011,5(z1):107-109,3.

南方电网技术

OACSTPCD

1674-0629

访问量0
|
下载量0
段落导航相关论文