泥沙研究Issue(6):59-63,5.
三峡工程运用初期坝区泥沙淤积与模型试验成果分析研究
Comparative study of reservoir sedimentation results of Three Gorges Project in early stage and model test result
摘要
Abstract
The hydrologic and geomorphic data of the Three Gorges Project (TGP) observed from Jun. 2003 to Oct. 2006 are applied to verify and validate the TGP sedimentation model test. Then, the deviation between the model test results and field data are analyzed. The analysis shows the TGP sedimentation model test results are . basically consistent with the field data, the sedimentation distribution and variation are very similar, so the quantitative prediction based on the model test is satisfactory. The reason for the deviation arises from various aspects, such as model sediment similarity, suspended sediment concentration scale, scour and deposition problems, density current motion similarity, etc. Further, suggestions about TGP sedimentation and certain model scale adjustments are presented based on this study.关键词
三峡工程/坝区模型/泥沙淤积/验证试验Key words
Three Gorges Project/ reservoir model/ sedimentation/ verification and validation experiment分类
建筑与水利引用本文复制引用
黄建成,王凤..三峡工程运用初期坝区泥沙淤积与模型试验成果分析研究[J].泥沙研究,2011,(6):59-63,5.基金项目
国家科技支撑计划项目资助(课题编号2006BAB0502) (课题编号2006BAB0502)