起重运输机械Issue(2):8-13,6.
立体轨道式自动化码头设备调度策略仿真分析
摘要
Abstract
This paper analyzes the typical operating procedure of the new stereo rail automatic container terminal. The 2D and 3D simulation models for the terminal are built up and are driven to run by using heuristic scheduling rules. The a-nalysis of operating efficiency, facility utilization rate and the systems' bottlenecks, and then assessment and optimization of the corresponding scheduling strategies under different conditions is conducted so as to improve the operating efficiency of the terminal. The simulation results provide a basis for terminal design and operation schedule-making.关键词
集装箱码头/计算机仿真/调度策略Key words
container terminal/computer simulation/scheduling strategy分类
交通工程引用本文复制引用
梁燕,吴富生,叶军..立体轨道式自动化码头设备调度策略仿真分析[J].起重运输机械,2012,(2):8-13,6.基金项目
国家863计划重点项目(2009AA043000) (2009AA043000)