核电站环行起重机钢丝绳缠绕系统分析

武建平 高秀芬 顾翠云

起重运输机械Issue(3):63-65,3.
起重运输机械Issue(3):63-65,3.

核电站环行起重机钢丝绳缠绕系统分析

武建平 1高秀芬 1顾翠云1

作者信息

  • 1. 太原重型机械集团有限公司 太原030024
  • 折叠

摘要

Abstract

This paper introduces some problems that should be considered when polar crane wire rope reeving system is designed, and analyzes the selection of wire rope safety factor, hoisting vertical degree control, and measures to delete the hoisting blind area, etc. The purpose is to make sure the safety of wire rope reeving system and meet specific hoisting technology requirements.

关键词

核电站/环行起重机/钢丝绳缠绕系统

Key words

nuclear power station / polar crane/ wire rope reeving system